Current gate
Production readiness cannot be determined without authenticated, current evidence.
P0 / P1 / P2 CONTROL
Every requirement has an owner, target environment, verification method, acceptance criteria, evidence reference, dependencies, and an explicit status.
Production readiness cannot be determined without authenticated, current evidence.
Runtime safety configuration is unavailable and must not be assumed.
Local tests are labelled local. Preview Shadow reports are not observation evidence. No control passes without durable evidence for its required environment.